Skip to main content

Chemical Process

INNOVATION AND SAFETY ARE THE KEYS TO SUCCESS

Get a Quote

Providing a vast inventory of rigging and transportation equipment combined with innovative techniques to mitigate a shutdown and reducing turnaround time, saving you both time and money.

Chemical process plants don't just need a company that can provide successful heavy lifting and transportation—they need that company to have a proven safety record. Beyond safety, innovation is the key to success. Anyone can offer you equipment. Barnhart provides a vast inventory of rigging and transportation equipment combined with innovative techniques to mitigate a shutdown and reducing turnaround time, saving you both time and money.

  • Real safety through effective management and training
  • Specializing in time critical outages
  • Contingency rigging planning for critical equipment
  • Custom rigging design and fabrication
  • Heavy transportation - fabricator to anchor bolts
  • Crane service from 8.5 tons to 1,760 tons
  • Engineered Lift Plans
  • Experienced in placing equipment in constricted areas
  • Modular Lift Towers to 1,600 tons

Projects

Scrubber Roll-off and Install Project Image

Scrubber Roll-off and Install

Barnhart's Chicago crew rolled off a 309,000-pound, 40-foot scrubber at a refinery in Joliet, Illinois. The vessel arrived resting on cribbing on the deck

Learn More
Deethanizer Offload and Set Project Image

Deethanizer Offload and Set

Barnhart was tasked with offloading and setting a deethanizer and quench tank at a chemical plant in Kentucky. The work took place next to two live units

Learn More
Reactor Installation  Project Image

Reactor Installation

Barnhart was hired to offload a 45,000 lb. reactor and install it in a fully operating chemical plant in Tennessee. The reactor was first offloaded from a

Learn More
Boiler Installation  Project Image

Boiler Installation

Barnhart was contracted by a corn processing plant to assist in the sliding and setting of a 300,000-pound package boiler. While the client considered

Learn More
Absorber Vessel Transport Project Image

Absorber Vessel Transport

A 129-foot-long absorber vessel needed to be transported from a fabricator in Winterville, North Carolina, across the country to a chemical plant in

Learn More
Preheater Removal and Replacement Project Image

Preheater Removal and Replacement

Barnhart was contracted to remove and replace two identical U-shaped heat exchangers at a chemical plant from a location in a structure approximately 25'

Learn More
Scrubber Removal and Replacement Project Image

Scrubber Removal and Replacement

Barnhart was hired to remove and replace a 20,000-pound scrubber at a chemical plant in Arizona. It was 34’-8” tall and 6’-6” diameter and inside

Learn More
Stripper Removal and Replacement Project Image

Stripper Removal and Replacement

Barnhart was hired to remove andreplace three vessels at a chemicalplant in Georgia. One in particular, a313,000-pound stripper, posed a

Learn More
Gas Cooler Removal and Replacement Project Image

Gas Cooler Removal and Replacement

Barnhart was hired to remove and replace a gas cooler at achemical plant in Iowa. There were many obstacles along thepath including overhead pipes,

Learn More
Cold Box Haul and Set Project Image

Cold Box Haul and Set

Barnhart was hired to move a 223,999-pound cold box fromthe Port of Tacoma in Washington to an industrial plant in Kent,Washington. The box was 117'

Learn More